Rider TOU - Thermal
Energy Storage
Application:
This rate is applicable to any customer
on the General Service - Demand, Primary Service, Large Primary
Service (including Time-of-Use), Large Primary Special Contract
Rider (including Time-of-Use), State General Service - Demand,
State Primary Service, State Large Primary Service (including
Time-of-Use), or Independent School Districts General Service
- Demand (including Time-of-Use) rate who shifts to off-peak
time periods no less than the lesser of 20% of the customer's
normal on-peak Summer Billed Demand or 2,500 kW through the
use of Thermal Energy Storage technology. The normal on-peak
Summer Billed Demand shall be the maximum Summer Billed Demand
recorded prior to attaching this rider, or as may be determined
by the City of Austin.
Rate:
The customer shall continue to be billed under the applicable
current rate ordinance with the following provisions:
Summer Billed Demand: From May through October, the Summer
Billed Demand shall be the highest fifteen-minute demand recorded
during the on-peak period. The Summer Billed Demand shall
not be less than 50% of the normal on-peak Summer Billed Demand.
If more than 50% of the customer's load is attributable to
cooling, the 50% floor will be waived.
Winter Billed
Demand: From November through April, the Winter Billed
Demand shall be the highest fifteen-minute demand recorded
during the month, or 90% of the Summer Billed Demand set in
the previous summer; whichever is less.
On-Peak:
4:00 p.m. to 8:00 p.m., Monday through Friday; May 1 through
October 31.
Off-Peak: 8:00
p.m. to 4:00 p.m., Monday through Friday; all day Saturday,
Sunday, Memorial Day, Independence Day, and Labor Day; May
1 through October 31. All day November 1 through April 30.
Conditions of Service:
A. The customer shall enter into a
separate agreement with the City of Austin for this rider.
B. The customer shall continue to
be served under the terms and conditions of, and shall continue
to comply with, all rules and regulations of the City of Austin
as amended from time to time during the term of this agreement.
C. The on-peak load shall be shifted to
off-peak; not eliminated or replaced by alternative fuels.
D. The customer shall permit the City to
install all equipment necessary for time-of-use metering and
to permit reasonable access to all electric service facilities
installed by the City for inspection, maintenance, repair,
removal, or data recording purposes.
We make every effort to be accurate in
displaying rates online. In case of conflict, the official
tariffs on file with the City Clerk's office take precedence. |