Facility Connection Requirements
Austin Energy, in compliance with North American Electric Reliability Corporation (NERC) Standard FAC-001-0, “shall document, maintain, and publish facility connection requirements to ensure compliance with NERC Reliability Standards and applicable Regional Reliability Organization, subregional, Power Pool, and individual Transmission Owner planning criteria and facility connection requirements.”
Source: NERC Standard FAC-001-0 – Facility Connection Requirements
View and download the Austin Energy Facility Connection Requirements (pdf)
View and download the Austin Energy Distribution Interconnection Guide for Customer-Owned Power Production Facilities 50 kW < 10 MW (pdf)
|